• 298 TWh Energy Demand
  • 124.9 GW Installed Capacity
  • 45 % Renewable Share

Iberia

The Iberian market operates as a single market across the Iberian peninsular (Spain and Portugal). Spot market prices are the same across the region for most of the time but may differ for each country if there are contraints on the interconnectors between them. Renewable generation (mainly wind and hydro) represents around half of installed capacity and ~40% of generation

  • Total Capacity
  • Total Generation
REE/REN, 2019

Total
Capacity
125 GW

NULL

Market Design

How is the market structured?

The Iberian Market has competitive wholesale and retail markets. Physical power is largely sold through a centralised pool (OMIE), although it is not mandatory and generators are able to sell both physical power via bilateral arrangements and financially settled contracts on the futures exchange. Electricity users are free to choose their supplier. Network chares are regulated and passed through by suppliers into the final bill

The Iberian Market covers mainland Spain and Portugal. There are separate regulators, system operators and policymakers that determine local transmission and distribution costs, supply regulations and renewable policy etc in the two jursidictions.

Spot market prices are the same across the Iberian peninsular for most of the time but may differ for each country if there are contraints on the interconnectors between them. Congestion and technicial restrictions are resolved in a specific within-day market and the costs of managing those constraints is recovered uniformly across all users of the system.

There are limited OTC and financial contracts traded beyond 2 years

End-users must buy their power from a licenced electricity supplier unless the power is generated on-site.

Network charges and other system costs (such as capacity payment costs and legacy renewable supports) are charged to electricity suppliers who pass these through to end users

Across the EU, renewable generation is certified using GoOs (Guarantees of Origin). GoO certificates are issued by the national regulator for every MWh of eligible renewable output.
These certificates are used by suppliers to meet their Fuel Mix Disclosure (FMD) requirements in order to report the average mix of electricity they have bought to supply their customers.

Regulators:

  • CNMC (National Commission of Markets and Competition) – Spain
  • ERSE (Energy Services Regulatory Authority) – Portugal

Key Government Departments:

  • Ministry of Energy, Toursim and the Digital Agenda – Spain
  • Ministry of Environment, Spatial Planning and Energy – Portugal

System Operators:

  • REE – Spain
  • REN – Portugal

Power Exchanges:

  • Physical Exchange (OMIE)
  • Futures Exchange (OMIP)

  • solar Solar
  • wind Wind
  • dg-solar DG Solar